SHOWING
'CC' BREAKDOWNS ON-SCREEN
INTRODUCTION:
The
following shows the procedure to include 'CC' (Cost Category) breakdown
columns in a Project.
These columns will then dynamically show the COST of the specified 'CC' (e.g. LA,MA,SC,PE,PO,etc) at each Cost Item/Section/Project level.
PROCEDURE:
NOTE: If the CC breakdown is required only on the
Summary Sheet, then you only need to do the following to the Section Names
worksheet.
PRECAUTIONS:
EVERY worksheet of the above mentioned type MUST have a 'CC' column with the correct attributes, otherwise the 'tallying' of the COSTS will not get carried forward to the Summary.
EstimatorVJ calculates the 'CC' totals in a slightly different way when Printing and On-screen display. This enables a CHECK that all worksheets are operating correctly, by comparing the values on a printed Summary, and the total shown on-screen.
If they do not match, then one or more worksheets do not include the 'CC' column with the correct attributes.
Comparing at various levels will eventually show where the discrepancy lies.